Results, order, filter

46 Jobs in Florida

  • Sr PGD Wind Turbine Control Specialist

    NextEra Energy - Palm Beach Gardens, Florida
    ... Sr PGD Wind Turbine Control Specialist Date: May 9, 2024 **Location(s ... is the world's largest generator of renewable energy from the wind and sun, and a world leader in ...
  • Sr. PGD Engineer - Solar PV

    NextEra Energy - Palm Beach Gardens, Florida
    ... Sr. PGD Engineer - Solar PV Date: Apr 23, 2024 Location(s): Palm Beach ... world's largest generator of renewable energy from the wind and sun, and a world leader in battery ...
  • Associate PGD Engineer - FPL Solar - ROI Panhandle Region

    NextEra Energy - Panama City, Florida
    ... Associate PGD Engineer - FPL Solar - ROI Panhandle Region Date: Apr 30, 2024 ... carbon emissions from our operations by 2045 by expanding our solar capacity, increasing battery storage ...
  • PGD Engineer - FPL Solar - Panhandle Region

    NextEra Energy - Pensacola, Florida
    ... PGD Engineer - FPL Solar - Panhandle Region Date: Apr 18, 2024 **Location(s ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ...
  • Senior PGD Tech Services Project Mgr

    NextEra Energy - Palm Beach Gardens, Florida
    ... is the world's largest generator of renewable energy from the wind and sun, and a world leader in ... projects. The project may include restoration of a catastrophic failure wind turbine and/or implementing ...
  • Senior Electrical Engineer

    NextEra Energy - Palm Beach Gardens, Florida
    ... world's largest generator of renewable energy from the wind and sun, and a world leader in battery ... ** NextEra Energy’s Power Generation Division is looking for a Senior Electrical Engineer for the Wind ...
  • Nuclear Field Associate Engineer

    NextEra Energy - Jensen Beach, Florida
    ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ...
  • Nuclear Field Associate Engineer

    NextEra Energy - Jensen Beach, Florida
    ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ...
  • Nuclear Field Associate Engineer

    NextEra Energy - Jensen Beach, Florida
    ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ...
  • Sr Land Planner

    NextEra Energy - Juno Beach, Florida
    ... Real Zero carbon emissions from our operations by 2045 by expanding our solar capacity, increasing ... the solar projects for FPL and FRP, working with the team on all land use and zoning issues. When ...
  • Engineer II - North Port/Fort Myers

    NextEra Energy - North Port, Florida
    ... carbon emissions from our operations by 2045 by expanding our solar capacity, increasing battery storage ...
  • Environmental Services Manager

    NextEra Energy - Juno Beach, Florida
    ... world's largest generator of renewable energy from the wind and sun, and a world leader in battery ...
  • Manager, UX Design & Operational Excellence

    NextEra Energy - Juno Beach, Florida
    ... from our operations by 2045 by expanding our solar capacity, increasing battery storage and bringing ...
  • GPR Locator

    MasTec Advanced Technologies - Davie, Florida
    ... conditions, such as extreme heat, extreme cold, rain, ice, snow, and wind. The physical demands ... conditions, such as extreme heat, extreme cold, rain, ice, snow, and wind. The physical demands ...
  • Environmental Specialist

    NextEra Energy - Juno Beach, Florida
    ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ...
  • Energy Solutions Specialist- Stuart/ Port St Lucie

    NextEra Energy - West Palm Beach, Florida
    ... carbon emissions from our operations by 2045 by expanding our solar capacity, increasing battery storage ... ranging from rooftop solar, electric vehicles and complex HVAC systems, etc. to provide energy efficiency ...
  • Energy Solutions Specialist- Merritt Island

    NextEra Energy - Merritt Island, Florida
    ... from our operations by 2045 by expanding our solar capacity, increasing battery storage and bringing ... ranging from rooftop solar, electric vehicles and complex HVAC systems, etc. to provide energy efficiency ...
  • Energy Solutions Specialist- Sarasota

    NextEra Energy - Sarasota, Florida
    ... operations by 2045 by expanding our solar capacity, increasing battery storage and bringing new renewable ... solar, electric vehicles and complex HVAC systems, etc. to provide energy efficiency programs and ...
  • Permit Coordinator

    MasTec Advanced Technologies - Pembroke Park, Florida
    ... , working in inclement weather conditions, such as extreme heat, extreme cold, rain, ice, snow, and wind ... , snow, and wind. The physical demands described here are representative of those that must be met ...
  • Lead Project Manager - Transmission/Substation

    NextEra Energy - Jupiter, Florida
    ... from our operations by 2045 by expanding our solar capacity, increasing battery storage and bringing ...
  • Sr Engineer Tech Applications - Transmission/Substation

    NextEra Energy - Miami, Florida
    ... from our operations by 2045 by expanding our solar capacity, increasing battery storage and bringing ...
  • Energy Solutions Specialist - St. Augustine

    NextEra Energy - St Augustine, Florida
    ... from our operations by 2045 by expanding our solar capacity, increasing battery storage and bringing ... solar, electric vehicles and complex HVAC systems, etc. to provide energy efficiency programs and ...
  • Interconnection Specialist

    NextEra Energy - Juno Beach, Florida
    ... 's largest generator of renewable energy from the wind and sun, and a world leader in battery storage. We ...
  • PGD Senior Engineer Generator & Electrical Distribution

    NextEra Energy - Juno Beach, Florida
    ... carbon emissions from our operations by 2045 by expanding our solar capacity, increasing battery storage ...
  • Substation Superintendent

    MasTec Advanced Technologies - Fort Myers, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
  • Substation Superintendent

    MasTec Advanced Technologies - Orlando, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
  • Substation Superintendent

    MasTec Advanced Technologies - West Palm Beach, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
  • Substation Superintendent

    MasTec Advanced Technologies - Fort Myers, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
  • Substation Superintendent

    MasTec Advanced Technologies - Tampa, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
  • Substation Superintendent

    MasTec Advanced Technologies - Tampa, Florida
    ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ... , rain, ice, snow, and wind. The physical demands described here are representative of those that ...
More